Via Morgagni | Milan

Category: Safety

Commission for the Safety Coordination in design and execution phases for a Liberty building renovation in Milan. The works involved the building total demolition, only maintaining the three main façades with a structural staffoild supporting them. After the demolition phase, the consolidation phase was carried out through micro-pier supports, then another underground level was excavated, flowed by the construction of the building structure. The building site was eventually closed after adding an additional floor over the rooftop, the design of a roof terrace, the positioning of all the furniture and the design of a water featured garden.